Six-week optimisation cycle

The cadence that turns marketing from a list of requests into a sequence of removed constraints.

Written for Teams working hard on a backlog assembled from whoever asked most recently.

The bottleneck

Most marketing backlogs are prioritised by who asked loudest and most recently. That produces constant activity across many small items and no measurable movement on the thing actually limiting growth.

A fixed cycle forces one question at the start: what is the single biggest constraint right now, on evidence. Everything else waits. That is uncomfortable and it is where the compounding comes from.

Why it happens, five levels down

  1. Effort is high and results are flat.Why? Work is spread across many low-impact items.
  2. Priorities are set by request volume.Why? There is no evidence-based prioritisation method.
  3. Nobody ranks constraints by impact.Why? Nobody measures constraints in the first place.
  4. Measurement is not part of planning.Why? Planning happens in meetings, not against data.
  5. There is no operating rhythm.Root cause. Without a cycle, the loudest request wins every time.

The diagnostic

Run this before planning any work. It tells you whether this is your constraint or whether something else is.

  • List everything currently in progress. Rank by likely revenue impact. Note how many are low.
  • Ask what the single biggest constraint is. If answers differ, that is the first problem.
  • Check whether any work in the last quarter was measured against a baseline.
  • Identify who can say no to a request. If nobody can, the cycle will not hold.
  • Check whether learnings from finished work are recorded anywhere.
  • Count how many things started in the last quarter versus how many finished.

The build sequence

StageWorkTiming
Week 1Diagnose. Establish the current constraint from evidence, not opinion.
Week 2Prioritise. Choose one constraint, record the baseline, write down what you are not doing.
Weeks 3–4Execute. Work on the chosen constraint only.
Week 5Test. Measure against the baseline. Be willing to conclude it did not work.
Week 6Report, document the learning, and choose the next constraint.

KPI watchlist

MetricSourceRead it as
Movement on the chosen KPIWhichever system owns itWhether the cycle worked
Learnings recordedCycle logWhether the team compounds
Backlog qualityBacklog reviewWhether prioritisation improved
Cycles completed on timeProject recordWhether the rhythm holds

Record a baseline and a date range for each before any work begins. Reconstructing a baseline afterwards is usually impossible.

Four ways this goes wrong

  • Running two constraints at once. You learn nothing about either.
  • Extending a cycle because the work is not finished. Cut scope instead.
  • Skipping week five because the result looks poor. That is the most valuable week.
  • Letting an urgent request restart the cycle. Log it for the next one.

Pick one constraint and hold it for six weeks

The discipline is refusing everything else, and that is where the compounding is.

What do you think?
Insights

More Related

Diversity, Equity, and Inclusion

Creating a GTM workflow where there had been none

Building the site, and the client’s own social capability

Connecting the website and CRM into one intake system

An e-commerce build across three markets

Turning a dormant social presence into a client source

Making the agency unnecessary